Main.Collections History
Hide minor edits - Show changes to output
Changed line 35 from:
* May 2013 [[http://www.lib.berkeley.edu/doemoff/dmwiki/billednotpaidmay2013.xlsx | Billed/NotPaid]]
to:
* May 2013 [[http://www.lib.berkeley.edu/doemoff/dmwiki/billednotpaidMay2013.xlsx | Billed/NotPaid]]
Added lines 34-35:
* May 2013 [[http://www.lib.berkeley.edu/doemoff/dmwiki/billednotpaidmay2013.xlsx | Billed/NotPaid]]
Added lines 10-12:
* Apr 2013: [[http://www.lib.berkeley.edu/doemoff/dmwiki/missingapr2013.xlsx | Missing 3 months+]] | [[http://www.lib.berkeley.edu/doemoff/dmwiki/billedpaidapr2013.xlsx | Billed/Paid]]
Added lines 31-32:
* Feb 2013 [[http://www.lib.berkeley.edu/doemoff/dmwiki/billednotpaidfeb2013.xlsx | Billed/NotPaid]]
Changed line 3 from:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | refer for replacement (RFR) procedures]] posted in AskTico. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Step-by-step [[Attach:RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available. Each Doe/Moffitt location has [[http://www.lib.berkeley.edu/asktico/procedures/refer-replacement#App1 | designated staff for decisions and actions]]. Please follow the [[Attach:orderguidelines.pdf | guidelines for ordering replacements]] as outlined by the Order Division.
to:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/refer-replacement | refer for replacement (RFR) procedures]] posted in AskTico. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Step-by-step [[Attach:RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available. Each Doe/Moffitt location has [[http://www.lib.berkeley.edu/asktico/procedures/refer-replacement#App1 | designated staff for decisions and actions]]. Please follow the [[Attach:orderguidelines.pdf | guidelines for ordering replacements]] as outlined by the Order Division.
Added lines 10-11:
* Jan 2013: [[http://www.lib.berkeley.edu/doemoff/dmwiki/missingjan2013.xlsx | Missing 3 months+]] | [[http://www.lib.berkeley.edu/doemoff/dmwiki/billedpaidjan2013.xlsx | Billed/Paid]]
Changed line 30 from:
* Nov 2012 [[ | Billed/NotPaid]]
to:
* Nov 2012 [[http://www.lib.berkeley.edu/doemoff/dmwiki/billednotpaidnov2012.xlsx | Billed/NotPaid]]
Added lines 29-30:
* Nov 2012 [[ | Billed/NotPaid]]
Added lines 10-11:
* Oct 2012: [[http://www.lib.berkeley.edu/doemoff/dmwiki/missingoct2012.xlsx | Missing 3 months+]] | [[http://www.lib.berkeley.edu/doemoff/dmwiki/billedpaidoct2012.xlsx | Billed/Paid]]
Changed lines 28-30 from:
* May 2012 [[http://www.lib.berkeley.edu/doemoff/dmwiki/billednotpaidmay2012.xlsx | Billed/NotPaid]]
* Feb 2012: [[http://www.lib.berkeley.edu/doemoff/dmwiki/billednotpaidfeb2012.xls | Billed/NotPaid]]
to:
* Aug 2012 [[http://www.lib.berkeley.edu/doemoff/dmwiki/billednotpaidaug2012.xlsx | Billed/NotPaid]]
Changed line 3 from:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | refer for replacement (RFR) procedures]] posted in AskTico. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Step-by-step [[Attach:RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available. Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]]. Please follow the [[Attach:orderguidelines.pdf | guidelines for ordering replacements]] as outlined by the Order Division.
to:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | refer for replacement (RFR) procedures]] posted in AskTico. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Step-by-step [[Attach:RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available. Each Doe/Moffitt location has [[http://www.lib.berkeley.edu/asktico/procedures/refer-replacement#App1 | designated staff for decisions and actions]]. Please follow the [[Attach:orderguidelines.pdf | guidelines for ordering replacements]] as outlined by the Order Division.
Added lines 10-11:
* Jul 2012: [[http://www.lib.berkeley.edu/doemoff/dmwiki/missingjul2012.xlsx | Missing 3 months+]] | [[http://www.lib.berkeley.edu/doemoff/dmwiki/billedpaidjul2012.xlsx | Billed/Paid]]
Changed line 11 from:
* Apr 2012: [[http://www.lib.berkeley.edu/doemoff/dmwiki/missingapr2012.xls | Missing 3 months+]] | [[http://www.lib.berkeley.edu/doemoff/dmwiki/billedpaidapr2012.xlsx | Billed/Paid]]
to:
* Apr 2012: [[http://www.lib.berkeley.edu/doemoff/dmwiki/missingapr2012.xlsx | Missing 3 months+]] | [[http://www.lib.berkeley.edu/doemoff/dmwiki/billedpaidapr2012.xlsx | Billed/Paid]]
Changed line 11 from:
* Apr 2012: [[http://www.lib.berkeley.edu/doemoff/dmwiki/missingapr2012.xlsx | Missing 3 months+]] | [[http://www.lib.berkeley.edu/doemoff/dmwiki/billedpaidapr2012.xlsx | Billed/Paid]]
to:
* Apr 2012: [[http://www.lib.berkeley.edu/doemoff/dmwiki/missingapr2012.xls | Missing 3 months+]] | [[http://www.lib.berkeley.edu/doemoff/dmwiki/billedpaidapr2012.xlsx | Billed/Paid]]
Changed line 26 from:
* May 2012 [[http://www.lib.berkeley.edu/doemoff/dmwiki/billednotpaidmay2012.xls | Billed/NotPaid]]
to:
* May 2012 [[http://www.lib.berkeley.edu/doemoff/dmwiki/billednotpaidmay2012.xlsx | Billed/NotPaid]]
Added lines 25-26:
* May 2012 [[http://www.lib.berkeley.edu/doemoff/dmwiki/billednotpaidmay2012.xls | Billed/NotPaid]]
Changed line 11 from:
* Apr 2012 [[http://www.lib.berkeley.edu/doemoff/dmwiki/missingapr2012.xlsx | Missing 3 months+]] | [[http://www.lib.berkeley.edu/doemoff/dmwiki/billedpaidapr2012.xlsx | Billed/Paid]]
to:
* Apr 2012: [[http://www.lib.berkeley.edu/doemoff/dmwiki/missingapr2012.xlsx | Missing 3 months+]] | [[http://www.lib.berkeley.edu/doemoff/dmwiki/billedpaidapr2012.xlsx | Billed/Paid]]
Added lines 10-11:
* Apr 2012 [[http://www.lib.berkeley.edu/doemoff/dmwiki/missingapr2012.xlsx | Missing 3 months+]] | [[http://www.lib.berkeley.edu/doemoff/dmwiki/billedpaidapr2012.xlsx | Billed/Paid]]
Changed line 24 from:
to:
* Feb 2012: [[http://www.lib.berkeley.edu/doemoff/dmwiki/billednotpaidfeb2012.xls | Billed/NotPaid]]
Changed line 24 from:
* Feb 2012: [[http:// | Billed/Not Paid]]
to:
Added lines 23-24:
* Feb 2012: [[http:// | Billed/Not Paid]]
Added line 11:
* Jan 2012: [[Attach:missingjan2012.xls | Missing 3 months+]] | [[Attach:billedpaidjan2012.xls | Billed/Paid]]
Changed lines 23-25 from:
to:
* Nov 2011: [[Attach:billednotpaidnov2011.xls | Billed/Not Paid]]
Changed lines 7-8 from:
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location, with selectors notifying their unit designee of items to replace by the end of that review month. Unit designees are asked to complete the record changes and order requests by February 20, May 20, August 20, and November 20 respectively.
to:
Selectors review these lists quarterly (January, April, July and October) and notify their unit designee of items to replace by the end of that review month. Unit designees complete record changes and order requests by February 20, May 20, August 20, and November 20 respectively.
Changed lines 19-20 from:
Lists should be reviewed quarterly (February, May, August, and November) for each Doe/Moffitt collection location, with selectors notifying their unit designees of items to replace by the end of that review month. Unit designees are asked to complete the record changes and order requests by March 20, June 20, September 20, and December 20 respectively.
to:
Selectors review this list quarterly (February, May, August, and November) and notify their unit designee of items to replace by the end of that review month. Unit designees complete record changes and order requests by March 20, June 20, September 20, and December 20 respectively.
Added lines 15-25:
''''Billed/Not Paid' Lists'''
Lists should be reviewed quarterly (February, May, August, and November) for each Doe/Moffitt collection location, with selectors notifying their unit designees of items to replace by the end of that review month. Unit designees are asked to complete the record changes and order requests by March 20, June 20, September 20, and December 20 respectively.
Lists for Gardner (MAIN) Stacks:
* November 2011
Changed lines 7-8 from:
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location, with selectors notifying their unit designee of items to replace by the end of that review month. Unit designees are asked to complete the record changes and order request by February 20, May 20, August 20, and November 20.
to:
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location, with selectors notifying their unit designee of items to replace by the end of that review month. Unit designees are asked to complete the record changes and order requests by February 20, May 20, August 20, and November 20 respectively.
Changed lines 3-4 from:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | refer for replacement (RFR) procedures]] posted in AskTico. Step-by-step [[Attach:RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available. Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]]. Please follow the [[Attach:orderguidelines.pdf | guidelines for ordering replacements]] as outlined by the Order Division.
to:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | refer for replacement (RFR) procedures]] posted in AskTico. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Step-by-step [[Attach:RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available. Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]]. Please follow the [[Attach:orderguidelines.pdf | guidelines for ordering replacements]] as outlined by the Order Division.
Changed lines 7-8 from:
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location, with selectors notifying their unit designee of items to replace by the end of that review month. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Unit designees are asked to complete the record changes and order request by February 20, May 20, August 20, and November 20.
to:
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location, with selectors notifying their unit designee of items to replace by the end of that review month. Unit designees are asked to complete the record changes and order request by February 20, May 20, August 20, and November 20.
Changed lines 3-4 from:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | refer for replacement (RFR) procedures]] posted in AskTico. Step-by-step [[Attach:RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available.
to:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | refer for replacement (RFR) procedures]] posted in AskTico. Step-by-step [[Attach:RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available. Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]]. Please follow the [[Attach:orderguidelines.pdf | guidelines for ordering replacements]] as outlined by the Order Division.
Changed lines 7-10 from:
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location, with selectors notifying their unit designee of items to replace by the end of that review month. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]].
Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]]. Please follow the [[Attach:orderguidelines.pdf | guidelines for ordering replacements]] as outlined by the Order Division. Unit designees are asked to complete the record changes and order request by February 20, May 20, August 20, and November 20.
to:
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location, with selectors notifying their unit designee of items to replace by the end of that review month. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Unit designees are asked to complete the record changes and order request by February 20, May 20, August 20, and November 20.
Changed lines 3-4 from:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Step-by-step [[Attach:RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available.
to:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | refer for replacement (RFR) procedures]] posted in AskTico. Step-by-step [[Attach:RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available.
''''Missing 3 Months +' and 'Billed/Paid' Lists'''
Changed lines 5-6 from:
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location, selectors notifying their unit designee of items to replace by the end of that month. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]].
to:
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location, with selectors notifying their unit designee of items to replace by the end of that review month. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]].
Changed lines 5-6 from:
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]]. Please follow the [[Attach:orderguidelines.pdf | guidelines for ordering replacements]] as outlined by the Order Division.
to:
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location, selectors notifying their unit designee of items to replace by the end of that month. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]].
Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]]. Please follow the [[Attach:orderguidelines.pdf | guidelines for ordering replacements]] as outlined by the Order Division. Unit designees are asked to complete the record changes and order request by February 20, May 20, August 20, and November 20.
Added lines 9-11:
* Oct 2011: [[Attach:missingoct2011.xls | Missing 3 months+]] | [[Attach:billedpaidoct2011.xls | Billed/Paid]]
Changed lines 5-6 from:
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]].
to:
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]]. Please follow the [[Attach:orderguidelines.pdf | guidelines for ordering replacements]] as outlined by the Order Division.
Changed lines 3-4 from:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Step-by-step [[attach:RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available.
to:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Step-by-step [[Attach:RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available.
Changed lines 3-4 from:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Step-by-step [[RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available.
to:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Step-by-step [[attach:RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available.
Changed lines 3-6 from:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Step-by-step [[RFR_excel.doc | instruction]] for downloading the lists on this page and sorting them in Excel are also available.
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]].
to:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Step-by-step [[RFR_excel.doc | instructions]] for downloading the lists on this page and sorting them in Excel are also available.
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]].
Changed lines 3-4 from:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]].
to:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Step-by-step [[RFR_excel.doc | instruction]] for downloading the lists on this page and sorting them in Excel are also available.
Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]].
Changed lines 3-4 from:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Each Doe/Moffitt location has [[Attach:designees.doc | designated staff for decisions and actions]].
to:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Each Doe/Moffitt location has [[Attach:designees.pdf | designated staff for decisions and actions]].
Changed lines 3-4 from:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]].
to:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]]. Each Doe/Moffitt location has [[Attach:designees.doc | designated staff for decisions and actions]].
Changed line 7 from:
* July 2011: Missing 3 months+ | Billed/Paid
to:
* July 2011: [[Attach:missing0711.xls | Missing 3 months+]] | [[Attach:billed0711.xls | Billed/Paid]]
Changed line 7 from:
* July 2011: Attach:Missing 3 months+ | Billed/Paid
to:
* July 2011: Missing 3 months+ | Billed/Paid
Changed lines 3-6 from:
Follow the [[procedures]] posted in AskTico to review items referred for replacement.
The procedures for processing RFR items are available in AskTico at http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement.
* July 2011: Missing 3 months+ | Billed/Paid
to:
Follow the [[http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement | procedures]] posted in AskTico to review items referred for replacement. Lists should be reviewed quarterly (January, April, July and October) for each Doe/Moffitt collection location. Reports for locations can be retrieved from [[http://www.lib.berkeley.edu/cgi-bin/notices/refer2selector.cgi | the referred to selector site]].
Lists for Gardner (MAIN) Stacks:
* July 2011: Attach:Missing 3 months+ | Billed/Paid
Added lines 1-6:
'''Refer for Replacement Lists'''
Follow the [[procedures]] posted in AskTico to review items referred for replacement.
The procedures for processing RFR items are available in AskTico at http://www.lib.berkeley.edu/asktico/procedures/doe-moffitt-refer-replacement.
* July 2011: Missing 3 months+ | Billed/Paid