Purpose:
To design a restoration plan that would be used by a group of neighbors
to address creek bank stabilization issues on their adjoining properties.
This plan could serve as a model for future restoration efforts
along Alhambra Creek.
The goal of
this project was to create a restoration plan for a site on Alhambra
Creek. The Plan included narrative and maps which displayed soil
bioengineering methods for creek bank stabilization. Central to
the plan was the use of a live crib wall, which involves the use
of log timbers constructed in a box frame, planted with riparian
plants and back filled with soil.